[OPERATOR CONFIRM: confirm specific applications before posting] Board of Supervisors public hearing — data-center conditional-use permits and special exceptions; comment window open through 5 PM June 9
Cheat sheet
June 10 — BoS Public Hearing (data-center applications)
This is the formal public comment hearing before the Board of Supervisors votes. Your comment goes on the official record. The Board — not the Planning Commission — makes the final call on conditional-use permits and special exceptions.
- When. Tuesday, June 10, 2026 at 6:00 PM. Doors open by 5:30 PM.
- Where. Board Room, Loudoun County Government Center, 1 Harrison Street SE, Leesburg, VA 20175.
- Written comment deadline. 5:00 PM on Monday, June 9. Email to
bos@loudoun.govwith the application number in the subject line. Written comments enter the official record even if you do not attend. - Livestream. Comcast Government Channel 1075 / Verizon FiOS Channel 40 / loudoun.gov/meetings.
Agenda status
[OPERATOR CONFIRM: pull the specific application numbers (LDCSP-####-####) from the agenda packet posted Thursday, June 5. Add them here before publishing.]
Typical June public-hearing items in the Sycolin Road and Route 7 corridors include conditional-use permits for data-center campuses requiring grid-load interconnection agreements with Dominion Energy Virginia.
At the podium
- 3 minutes per speaker. Yellow light at 30 seconds remaining, red at zero.
- Cite the application number. "I'm speaking to LDCSP-####-####" signals you've read the packet.
- Ground arguments in the Loudoun County Zoning Ordinance and the Comprehensive Plan — those are the legal standards the Board must apply.
- If the item is a conditional-use permit, the Board has discretion; conditions on noise, lighting, setbacks, and grid-impact mitigation are on the table and worth naming specifically.
Useful background
- The Board approved the Loudoun Data Center Policy Framework in 2023, creating an overlay district with cumulative-impact review. Reference this framework if your comments address cumulative grid load or viewshed impacts.
- Dominion Energy's Loudoun substation network is at or near capacity on several circuits — the interconnection queue status is public via PJM OASIS. Operators may cite queue position numbers.
- Written opposition filed at the Planning Commission stage is already in the record; you may reference prior Commission findings without re-arguing them.
Parking and logistics
- Surface lot on the south side of the Government Center; metered street parking on Harrison Street and Edwards Ferry Road.
- Sign-in sheet on the dais lectern (right side as you face the chamber). Sign in early — the chair typically calls speakers in sign-in order within each agenda item.